Sunday, June 4, 2017

Electricity


  1. Per Unit Charge
    1. The society gets a 33Kv line from the electricity board (TSSPDCL)
    2. Tariff schedule of TSSPDCL can be found here (Above link -> Tariffs & Regulations -> Tariff Schedule)
    3. We fall under the category - HT VI Townships & Residential Colonies
    4. As of 4th June 2017 the per unit charge for above category is Rs. 6.30
    5. There are no slabs for this category. The per unit charge does not change based on total consumption for the month.
    6. Apart from the per unit charge there are few add on charges
      1. Customer Charges
        1. For HT 33Kv category this value is Rs. 1,685 (approx a rupee or two per month per apartment)
      2. Electricity Duty
        1. 6 paise per unit
      3. Demand Charges
        1. Rs. 60 per kVA. At Contractual Max Demand 1800 kVA this figure is Rs. 108000. This is about 108 per apartment per month
    7. APMS charges us 6.76 per unit (information as of September 2016). This include the basic unit charge, add on charges listed in previous point and general transmission and distribution losses.
    8. Comparison of total charges for different unit consumption levels - 1) Normal connection 2) Connection in ALB
  2. How to recharge
    1. Pay cash at APMS office (C Block ground floor)
    2. Online transfer to APMS account
  3. Odd hour support
    1. The 24hr contact number for the electrician is posted inside the lift.